CLIENT: RWE NPower

Airtech's brief was to design, supply, install and commission a replacement 'Close Control' air conditioning system to their main on-site computer room.

The computer room is business critical and remained in use throughout the duration of the project.  Due to limited access, all indoor units were built on-site.

Airtech's works included the decommissioning and removal of existing plant with the provision of Airedale Close Control Systems, providing a temperature range of +/- 0.5 degrees celsius.  The total cooling duty provided for this scheme was 720kW.

Project Status: Complete